翻訳と辞書
Words near each other
・ TiddlyWiki
・ Tiddlywinks
・ Tiddville, Nova Scotia
・ Tiddy Mun
・ Tide
・ Tide (album)
・ Tide (brand)
・ Tide (disambiguation)
・ Tide (time)
・ Tide (transportation company)
・ Tide clock
・ Tide Cove
・ Tide gauge
・ Tide Head, New Brunswick
・ Tide jewels
Tide Light Rail
・ Tide mill
・ Tide Mill, Virginia
・ Tide Mills, East Sussex
・ Tide of Empire
・ Tide of Iron
・ Tide of Life
・ Tide pool
・ Tide table
・ Tide task force
・ Tide Water Pumping Station
・ Tide, Oregon
・ Tide-class replenishment oiler
・ Tide-class tanker
・ Tide-Line Blue


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Tide Light Rail : ウィキペディア英語版
Tide Light Rail

The Tide is a light rail line in Norfolk, Virginia, connecting Eastern Virginia Medical School, Downtown Norfolk, Norfolk State University, and Newtown Road. Service began on August 19, 2011,〔 the first light rail system in Virginia.
The Tide is operated by Hampton Roads Transit (HRT). Fares match local bus fares and the line accepts HRT's GO Passes.
==History==

In November 1999, the City of Virginia Beach conducted a referendum regarding the construction and operation of light rail into Virginia Beach along the Norfolk Southern railroad right-of-way. The proposed route would connect downtown Norfolk to the Virginia Beach oceanfront. The referendum led to a community discussion of the proposed light rail and feeder bus system. Local media and many special interest groups debated the matter in great detail, using information provided by a DEIS (Draft Environmental impact statement). The voters of Virginia Beach rejected the proposed light rail system. The Virginia Beach City Council then passed a 10-year resolution declaring that the city would no longer have any future involvement in the proposed light rail line. Years later, a major economic and development hub has been built along the Norfolk Southern rail corridor, known as the Virginia Beach Town Center. The new Town Center, along with record high gas prices in 2008, has now made many Virginia Beach residents that opposed the rail line have second thoughts on the plan. A renewed public interest in light rail has been stirred up as some that were opposed to rail see the viewpoint of proponents. A new referendum on light rail will not necessarily be needed in Virginia Beach due to the 10-year expiration of the previous referendum.
Since then, the City of Virginia Beach agreed to purchase the portion of the former ''Norfolk Southern Railway'' right-of-way within Virginia Beach from Norfolk Southern. This line extends from the Norfolk/Virginia Beach boundary (near the end of the light rail line in Norfolk), continuing almost due east through the ''Pembroke Town Center'' area to Birdneck Road, ending very near the waterfront area of the resort city. However, no firm plans (e.g. for LRT, Bus Rapid Transit, or other uses) have been announced for the purchased right-of-way.
After Virginia Beach pulled out of a proposal that would have seen the construction of a light rail line connecting downtown Norfolk with the Virginia Beach oceanfront in 1999, Norfolk began developing a network that would be constructed entirely within its city limits.
Beginning in 2000, HRT and federal transit officials worked to create a plan that would attract federal funding. On September 22, 2006, the Federal Transit Administration announced that the proposal met federal criteria for design, and would receive funding for a final design.〔 On October 1, 2007, the FTA signed the agreement to appropriate $128 million for the construction of the network. The remainder of the project will be divided three ways, with the city of Norfolk contributing $33 million, the Commonwealth of Virginia contributing $31.9 million, and $39.2 million being contributed from other federal sources.〔
Officials announced in June 2007 that the system would be called ''The Tide'', a name that beat out other proposed names, including Bay Runner, First Rail, Dash, Bay Breeze, Sail and Shore Line.
The trains generally run every 15 minutes; they run every 10 minutes during peak periods and every 30 minutes during early weekend mornings and late evenings. Service will be from 6:00 a.m. through 10 p.m Monday-Thursday, 6:00 a.m. through midnight on Friday-Saturday, 7:00 a.m through 9:00 p.m. on Sundays, and 9:00 a.m. through 9:00 p.m. on Holidays.〔
On 21 June 2011, HRTs announced the line would open on 19 August initially with demonstration rides followed by regular service beginning on 22 August. Due to high ridership during the initial demonstration period, estimated at over 46,000 riders, the demonstration period was extended, with regular service to begin on 28 August.
On 21 September 2011, Hampton Roads Transit announced the introduction of online ticketing and onboard WiFi to ''The Tide''.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Tide Light Rail」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.